This site can be navigated without Javascript using site links (along top) for main section nav and sidebar links (left side) for subsection nav.

jump to content - Skip all navigation Jump to site navigation Jump to section navigation
noaa nasa logo links to noaa home
nasa logo links to nasa home dept of commerce nasa logo links to doc home
A collaborative effort between NOAA, NASA, DOC and Industry
GOES R Program Office Banner
+ Home + Overview + Procurement + Products + Education and Training  

ACRONYMS

+ Home
+ Acronyms
+ Glossary
+ GOES-R Overview
+ Procurement
+ Products
+ Education and Training
+ User Readiness

Related sites

+ NOAA
+ NESDIS
+ NOAA OSD
+ NASA
+ NASA GSFC




GOES-R Acronyms and Abbreviations


A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z

C   Capacity
C   Celsius (degrees)
C2   command and control
C3   Command, Control and Communication
C3S   Command, Control, and Communications Segment (or System)
C&A   Certification and Accreditation  
CAD   computer-aided design
CADCAM   Computer Aided Design Computer Aided Manufacturing
CADR / CADRe   Cost Analysis Data Requirement
CAIV   Cost as an Independent Variable
CAM   Commerce Acquisition Manual (DOC)
CAM   Control Account Management
CAN   Cooperative Agreement Notice
CAP   Contractor Acquired Property
CAPL   Capillary Pumped Looped Technology
CAR   Commerce Acquisition Regulations (DOC)
CARD   Cost Analysis Requirements Document
CBE   Contractor Best Estimate
CCA   Circuit Card Assembly
CCAFS   Cape Canaveral Air Force Station
CCB   Configuration Control Board
CCBD   Configuration Control Board Directive
CCD   Charge Coupled Device
CCHP   Constant Conduction Heat Pipe
CCR   Configuration Change Request
CCRM   Continuous Cost Risk Management
CCSDS   Consultative Committee for Space Data Systems
CD   Center Director
CD   Compact Disk
CDA   Command and Data Acquisition
CDAS   Command and Data Acquisition Station
C&DH   Command and Data Handling
CDL   Controlled Documents List
CDR   Critical Design Review
CDRD   Contract Data Requirements Document
CDRL   Contract  Data Requirements List
CERT   Cost Estimation Reconciliation Team
CFE   Contractor-Furnished Equipment
CFO   Chief Financial Officer
CFSR   Contract Funds Status Report
CFY   contract fiscal year
CHOP   Countermeasures Hands-On Program
CIL   Critical Items List
CI   configuration item
CIO   Chief Information Officer
CIRT   Contractor Interim Response Team
CITRB   Commerce Information Technology Review Board (DOC)
CLASS   Comprehensive Large Array-data Stewardship System
CLIN   contract line item number
cm   centimeter
CM   Configuration Management
CMART   Configuration Management and Anomaly Reporting & Tracking
CMC   Center Management Council (GSFC)
CMD   command
CMD   Contract Management Division
CME   Coronal Mass Ejection(s)
CMO   Configuration Management Office
CM&O   Center Maintenance and Operations
CMP   Center Real Property Master Plan 
CMP   Configuration Management Plan
CMMI   Capability Maturity Model Integration
CND   Could-Not-Duplicate
CNR   Clutter-to-Noise Ratio
CO   Contracting Officer
CoF   Construction of Facilities
COFR   Certificate of Flight Readiness
COI   critical operations issues
COMM   Communications
COMSEC   Communications Security
CONOPS / ConOps   Concept of Operations
CONUS   Contiguous United States
COOP   Continuity of Operations
COP   Contingency Operations Procedure
COPV   Composite Overwrapped Pressure Vessel
COR   Contracting Officer’s Representative
CORL   Consolidated Observational Requirement List
COSPAS   Cosmicheskaya Sistyema Poiska Avariynich Sudov (Space System for the Search of Vessels in Distress)
COTR   Contracting Officer’s Technical Representative
COTS   Commercial Off-The-Shelf
CP   Command Procedure
CPC   Computer Program Component
CPCI   Computer Program Configuration Item
CPL   Capillary Pumped Loop
CPI   Cost Performance Index
CPM   Computer Program Module
CPMT   Command Procedure Message Text
CPR   Contractor Performance Report
CPR   Cost Performance Report
CPSR   Contractor Purchasing System Review
CPT   Comprehensive Performance Test
CPU   Central Processing Unit
CQCM   Cryogenic Quartz Crystal Microbalance
CRC   Cyclic Redundancy Check
CRM   Continuous Risk Management
CRYOHP   Cryogenic Heat Pipe
CRYOTP   Cryogenic Two Phase
CS   Conducted Susceptibility
CSC   Computer Software Component
CSCI   Computer Software Configuration Item
CSI   Customer Source Inspections
CSU   channel service unit
CTG   Cost To Go
CTV   Compatibility Test Van
CVCM   Collected Volatile Condensable Material
CWBS   Contractor Work Breakdown Structure

 

top of pageTop of: Page | Content | PageNav | SiteNav

+ Privacy Policy   + Disclaimer   + USA.gov
+ Contact Us