| P3I or P3I |
|
Pre-Planned Product Improvement |
| PA |
|
formance assurance |
| PACR |
|
Planned Activity Change Request |
| PAF |
|
payload attachment fitting |
| PAPL |
|
Project Approved Parts List |
| PA&R |
|
Program Audit and Review (OSMA) |
| PB |
|
petabyte (10E15 bytes) |
| PBM |
|
Program Business Manager |
| PC |
|
proposed change |
| PCA |
|
physical configuration audit |
| PCA |
|
Program/Project Commitment Agreement |
| PCB |
|
printed circuit board |
| PCC |
|
Program Cost Commitment |
| PCO |
|
Procurement Contracting Officer |
| PCP |
|
Parts Control Program |
| PD |
|
Position Description |
| PD |
|
Product Distribution (Ground Segment Element) |
| PDA |
|
percentage of defectives allowable |
| PDA |
|
personal digital assistant |
| PDL |
|
Product Development Lead |
| PDR |
|
Preliminary Design Review |
| PDRR |
|
Program Definition and Risk Reduction |
| PDT |
|
Product Design Team |
| PDT |
|
Product Development Team |
| PE |
|
Project Engineer |
| PEB |
|
Performance Evaluation Board |
| PEM |
|
plastic encapsulated microcircuits |
| PER |
|
Pre-Environmental Review |
| PES |
|
Performance Evaluation System |
| PFM |
|
protoflight model |
| PG |
|
Product Generation (Ground Segment Element) |
| PG |
|
Procedures and Guidelines |
| PHA |
|
Preliminary Hazard Analysis |
| PIL |
|
Parts Identification List |
| PIND |
|
Particle Impact Noise Detection |
| PLAR |
|
Post-Launch Acceptance Review |
| PLN |
|
Plan |
| PLPT |
|
Post-Launch Product Test |
| PLT |
|
post-launch test |
| PM |
|
payload module |
| PM |
|
Product Monitor |
| PM |
|
Program Management |
| PM |
|
Project Manager |
| PMA |
|
Preliminary Mission Analysis |
| PMAM |
|
Program Mission Assurance Manager |
| PMC |
|
Program Management Council (NOAA) |
| PMCB |
|
Parts and Materials Control Board |
| PMCP |
|
Parts and Materials Control Plan |
| PMO |
|
Program Management Office |
| PMP |
|
Project Management Plan |
| PMR |
|
Program Management Review |
| PMR |
|
Project Management Review |
| PMSR |
|
Project Management Status Review |
| POA&M |
|
plans of action and milestone (security) |
| POC |
|
point of contact |
| POES |
|
Polar Operational Environmental Satellites |
| POP |
|
Period of Performance (contract) |
| POP |
|
point of presence (network) |
| POP |
|
Program Operating Plan |
| PORD |
|
Performance and Operational Requirements Document |
| POST |
|
power on self test |
| PP |
|
Project Plan |
| ppb |
|
parts per billion (1E-9) |
| PPBES |
|
Planning, Programming, Budgeting and Execution System |
| PPE |
|
Project Parts Engineer |
| PPF |
|
Payload Processing Facility |
| ppm |
|
parts per million |
| PPRD |
|
Payload Processing Requirements Document |
| PPS |
|
Pulse per second |
| PR |
|
project risk |
| PRA |
|
probabilistic risk assessment |
| PRAD |
|
Payload Resource Allocation Document |
| PRD |
|
Program Requirements Documents |
| PREL |
|
pre-launch |
| PRE-MSR |
|
Pre-Monthly Status Review |
| PRF |
|
performance requirements for |
| PRIMX |
|
Program Risk Information Management exchange |
| PSD |
|
power spectral density |
| PSE |
|
Program System Engineering |
| PSM |
|
Project Safety Manager |
| PSPEC |
|
Performance Specification |
| PSR |
|
Pre-Shipment Review |
| PSR |
|
Project Status Review |
| PSTR |
|
Pre-Storage Review |
| PTM |
|
prototype model |
| PTP |
|
Programmable Telemetry Processor |
| PTP |
|
Post Test Review |
| PVM |
|
Performance Verification Matrix |
| PVP |
|
Performance Verification Plan |
| PWB |
|
printed wiring board |
| |
|
|